Sky Properties has now submitted the Green Lane Eco Park planning applications (one in full for the Energos gasification facility and one in outline for the Anaerobic Digestion plant and Materials Recovery Facility) to Salford City Council and the Council will now hold a formal consultation on the proposals.

The full planning applications can be found below. However, a non-technical summary of the proposals can be viewed here for ease.

For full details of how to take part in the formal consultation run by Salford City Council, please see the ‘Get Involved’ page

Documents

Volume 1 - The Planning Applications  
Full Planning Application Form (for the Energos gasification facility)
Outline Planning Application Form (for the Anaerobic Digestion and Materials Recovery Facility)
Planning Statement
Statement of Consultation
Design and Access Statement
Application Drawings:
Full Application Click here
2228 02 01A – Location plan
2228 02 02A – Site plan as existing
2228 02 03B – Site layout
2228 02 04B – Gasification facility layout plans (levels Ground and 1)
2228 02 05B – Gasification facility layout plans (level 2 and roof)
2228 02 06A – Gasification facility elevations
2228 02 07A – Gasification facility elevations
2228 02 08A – Gasification facility sections AA and BB
2228 02 09A – Site elevations as proposed
2228 02 10B – Gasification facility air cooled condenser & turbine generator room
2228 02 11 – Weighbridge and security lodge
2228 02 12B – Landscaping layout
2228 02 13 – Fencing to perimeter
2228 02 45 – CHP & Substation & Transformer compound
N91697-09 access – Site access arrangement
Outline Application
2228 02 01A – Location plan
2228 02 02A – Site plan as existing
2228 02 43A – Development parameter plan
N91697-09 access – Site access arrangement
Illustrative Plans
2228 02 22B – Site layout for AD/MRF/Gasification facilities
2228 02 24A – Site elevations
Volume 2 - Environment Statement
Environmental Statement Click here
Environmental Statement
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Appendix J
Appendix K
Section 1 - Figure
Section 6 - Figure
Section 7 - Figure
Section 8 - Figures
Section 9 - Figure
Section 10 - Figure
Section 11 - Figures
Section 12 - Figures
Section 13 - Figure
Non-Technical Summary
Transport Assessment
Flood Risk Assessment
Surface Water Strategy
Volume 3 - Other supporting documents  
Carbon Assessment
Heat Demand Study
Site Waste Management Plan
Green Lane BREEAM Pre-Assessment
Site Utilities
Stack Assessment